Twitter | Search | |
Arun
Retweets are not endorsement. Replies & retweets not intended to offend anyone, if conveyed so shall do the needful to rectify it Here just to share my views.
5,811
Tweets
494
Following
89
Followers
Tweets
Arun 7h
वोट करायला जातांना लोक डोंबिवलिकार म्हणून वोट करतात आणि तामिळ,तेलगू,गुजराती मल्याळम, बेंगली,कांनडिगा म्हणून नाही करत। जी पक्ष अत्ता ही मुद्द्यांवर ना बोलत ही धंदे करतात त्यानि समजून घ्यावे FB/Whatsapp/Twitter चा जमाना आहे 1947 नाही। मग हरल्यावर रडत बसतील EVMच्या नावाने।
Reply Retweet Like
Arun retweeted
Pallavi 7h
Replying to @pallavict
This is becoz of our impressive of $430 billion & oil storage capacity of 5.33 Million Tonnes of crude oil - our strategic oil reserves
Reply Retweet Like
Arun 7h
सत्ता दशकांपासून सेना भाजप काढे आहे ना? शिवसेना भाजप चे वोट बँक मराठी माणूस नाही का? मुद्द्याच बोला,यवढे मुद्दे असून सुद्धा लोकांना मराठी, गुजराती, दक्षीण भारतीय ,उत्तर भारतीय अश्या वोट बँक मध्ये वाटून राहिलात म्हणून आज ही अवस्था झाली आहे। 1/2
Reply Retweet Like
Arun 8h
As it has already missed LS & VS elections deadline won't be surprised if it's delayed further to 2021 or 22
Reply Retweet Like
Arun 9h
Not really. Major issues are beyond Thane. But none of the metros (Line 1 to Line 13)cater to this segment. Only hope is line 14 even that's not expected anytime before 2024. So it's a far-fetched dream. Hopefully 5th 6th line Diva Thane link will give some respite.
Reply Retweet Like
Arun retweeted
History Of India 12h
People who are opposing Aarey Metro Shed- : who's bungalow build on Mangroves land, roams in SUV & Bollywood: Entire 'Filmcity' built cutting jungles of Aarey Biju Augustine Kattain: lives in 'Royal Palms', built cutting Jungles of Aarey
Reply Retweet Like
Arun 9h
Yep WR is better n they know with Line 2A & 7 almost ready things will be great. Things in Central is really bad, trains not on time, FOBs shut, regular accidents & system failures. Yes Escalators n Elevators are there but luxuries makes sense only when basics are met.
Reply Retweet Like
Arun 11h
Mumbaikar support Metro for sure but they even want decent roads. Which is not the case this time. Blame the rains or whatever conditions in MMR has only gotten worse n people are really annoyed W.r.t railways things have got worse in last 5 years. People wl keep all this in mind
Reply Retweet Like
Arun retweeted
Akshay Marathe 12h
Well well well another cat is out of the bag. opposes Aarey carshed of metro 3, a project for greater good of commuters in Mumbai and look who inaugurated Royal Palms golf course deeper inside Aarey!
Reply Retweet Like
Arun retweeted
Aamod Nerurkar 17h
Undisputable FACTS the champ blocktivists won't tell us.. They also won't tell us that DPR was published in 2011 and they'd eaten Fevicol then. Only after 2014, they'd got rid of Fevicol!
Reply Retweet Like
Arun retweeted
Pallavi 19h
facts don’t tell us Environmental Impact Assessment () report of having carshed in was prepared not by or any govt agencies but by a neutral agency - (Japan International Cooperation Agency)?
Reply Retweet Like
Arun retweeted
NaviMumbai Citizen's Voice 🇮🇳 18h
NaviMumbai, Kalyan, Dombivali, Ambernath,Badlapur people want Metro line 14 Kanjur-Ghansoli-Shil-Palava-Badlapur Route ASAP. This will decongest City, boost East-West connectivity, reduce pollution, increase Quality of living.
Reply Retweet Like
Arun retweeted
Sahil Pednekar 18h
The desperation keeps growing :))....wat a sad and pathetic way of getting things done
Reply Retweet Like
Arun retweeted
Beyond Thane News 19h
One more rail overbridge along Kalyan’s Patripool | cities | Hindustan Times
Reply Retweet Like
Arun 22h
Reply Retweet Like
Arun retweeted
MikGavas 22h
Replying to @gau_dab @chai2kul
Just like JVLR, Ghodbunder is clogged up as well, both tunnels will give both north and south suburbs direct entry towards Thane rather than just one side. Ghodbunder thus can act like an actual highway for heavy cargo transport as most locals will use those tunnels.
Reply Retweet Like
Arun retweeted
Chaitanya Kulkarni Sep 17
MCGM invites tender for construction of major 6 lane bridges & elevated rotary along Mulund Goregaon Link Road. The cost of the project is ₹579 crores.
Reply Retweet Like
Arun 22h
Will try to
Reply Retweet Like
Arun 22h
Which report are you referring pls enlighten us.
Reply Retweet Like
Arun 22h
Pls do Check for yourself. I have my facts correct. If tenders are given in 2018 how on earth have they completed over 35kms tunneling by now? Its simple logic. Oppose and criticize is the easiest thing to do. But doing it blindly without knowing the facts makes no sense.
Reply Retweet Like