Twitter | Search | |
Indian ☺ 18 Jan 19
Replying to @PChidambaram_IN
The design and development cost is same for all invariable of number. We are in process of issuing 100 RFP for new aircraft, the design and development cost will not be applicable to the new RFP.
Reply Retweet Like
Ramakrishnan 18 Jan 19
Replying to @PChidambaram_IN
Recycling old garbage helps only environment but not politics
Reply Retweet Like
Srees 18 Jan 19
Replying to @PChidambaram_IN
Sir, I think point No.4 needs a correction: If only 36 aircarafts are purchased and delivered between 2019 and 2022. You have put it as 2009 and 2012.
Reply Retweet Like
Sarath Chandra 18 Jan 19
Bravo Sir ..Bravo ...!
Reply Retweet Like
Palaneeswar 18 Jan 19
சாரதாசிட்பண்ட்,,ஏர்செல் மேக்சிஸ், ஸ்டெர்லைட் டைரக்டர் ஆக இருந்ததுபற்றி அறிக்கை விட்டால் உங்கள் நம்பகத்தன்மை மக்கள் அறிந்து கொள்ள முடியும்
Reply Retweet Like
sudhir 18 Jan 19
Replying to @PChidambaram_IN
Get ready for Tihar
Reply Retweet Like
Bharat Momaya 18 Jan 19
Replying to @PChidambaram_IN
The deal of such a nature should have been negotiated by an expert committee.
Reply Retweet Like
WHITE KNIGHT 18 Jan 19
It was negotiated by expert committee..
Reply Retweet Like
Malcolm Lobo 18 Jan 19
what a crying shame. It appears is only specialized in bluster and is devoid of any patriotic or common sense as this article shows. No defamation suit against the Hindu?
Reply Retweet Like