Twitter | Search | |
Mysuru Infrastructure
Mysuru Infrastructure news
5,886
Tweets
18
Following
1,394
Followers
Tweets
Mysuru Infrastructure 45m
Replying to @MysuruMemes
We can top the chart easily. Need a proactive state govt.
Reply Retweet Like
Mysuru Infrastructure retweeted
Mysuru Memes Jul 16
Top 7 Highest Money Making Tourism Cities In India.. Mysuru in 5th place
Reply Retweet Like
Mysuru Infrastructure retweeted
Raghu 5h
Please remove from your mind and tweets the thinking of "YOU PEOPLE & WE PEOPLE". Indian railways is a national carrier and provides connectivity across the nation. Indian railways is not a local bus operator.
Reply Retweet Like
Mysuru Infrastructure 5h
Reply Retweet Like
Mysuru Infrastructure 5h
Align your onward travel from BLR to other destinations with MYQ-BLR ALLIANCE AIR flight AI9897.
Reply Retweet Like
Mysuru Infrastructure 15h
Thanks for the continuous follow up sir. Thanks also to sir. Hope tourist operators come up with good tourism circuit packages connecting Goa-Cochin-BLR. More tourists mean MORE CIRCULATION OF MONEY IN LOCAL ECONOMY.
Reply Retweet Like
Mysuru Infrastructure retweeted
Pratap Simha 15h
Thanx to our beloved PM ji, I will be inaugurating Mys-Cochin, Mys-Hyderabad and Mys-Goa flights on Friday to boost tourism n improve air connectivity.
Reply Retweet Like
Mysuru Infrastructure retweeted
Rajesha Basavegowda (ರಾಜೇಶ್) Jul 17
Mysureans need connectivity in any form, whether it is extension or new train whatever it may be. Extension is easier than new train functioning. We are not blabbering only for extensions.
Reply Retweet Like
Mysuru Infrastructure retweeted
Ajith.M.S Jul 16
Several roads in to get much needed works as is set to call tender for 10.24 crore road/footpath works finally
Reply Retweet Like
Mysuru Infrastructure Jul 16
Sure. Extension + new trains will be the norm for Mysuru in future and soon.
Reply Retweet Like
Mysuru Infrastructure Jul 16
It is prudent to run 17301/02 till Miraj via considering economic benefits it would bring along the entire route. Slip coach option as suggested in letter is obsolete and railways is considering to phase it out.
Reply Retweet Like
Mysuru Infrastructure Jul 16
Any Apprehension over loss of seats can be addressed by ADDING 4 coaches. Currently 17301/02 runs with 16+2 SLR composition. 5 AM arrival at DWR will be comfortable for people from nearby districts for onward journey.
Reply Retweet Like
Mysuru Infrastructure retweeted
K.M. Nishanth Jul 15
ಮೈಸೂರಿನ ಇತಿಹಾಸ ಪ್ರಸಿದ್ಧ ದೊಡ್ಡ ಕೆರೆಯ ಏಕೈಕ ಕುರುಹುವಾಗಿ ಉಳಿದಿರುವ ಗೋಪುರ (Tank Water Gate) ಅಳಿವಿನ ಅಂಚಿಗೆ ತಲುಪುತ್ತಿದ್ದು, ಕೂಡಲೇ ಜಿಲ್ಲಾಡಳಿತ ಈ ವಿಚಾರವನ್ನು ಗಂಭೀರವಾಗಿ ಪರಿಗಣಿಸಿ ನಗರದ ಪರಂಪರೆಯನ್ನು ಉಳಿಸುವ ಕೆಲಸವನ್ನು ಮಾಡಬೇಕು, ಇಂತಹ ಐತಿಹಾಸಿಕ ಕುರುಹುಗಳನ್ನು ಉಳಿಸಬೇಕು.
Reply Retweet Like
Mysuru Infrastructure retweeted
Pratap Simha Jul 15
ಮೈಸೂರು ನಗರಪಾಲಿಕೆಯ ಅನುದಾನ ಹಂಚಿಕೆ ಬಗ್ಗೆಅಸಮಾಧಾನ: ಡಿಸಿಗೆ ಸಂಸದ ಪ್ರತಾಪ್ ಸಿಂಹ ಪತ್ರ
Reply Retweet Like
Mysuru Infrastructure retweeted
Raghu Jul 14
Train travellers increased many folds in last one decade. Reason : low ticket cost, lesser travel time, dirt cheap season ticket, increased punctuality, comfortable seating & amenities compared to bus/car. Almost all trains gets overcrowded at the starting station itself.
Reply Retweet Like
Mysuru Infrastructure retweeted
kk Jul 14
It's not the busses, there are more number of cars on road. Everyone should start taking the public transport, only then we can reduce the traffic.
Reply Retweet Like
Mysuru Infrastructure retweeted
kk Jul 14
It will be better, if we cn get more buses from Mysore to Bengaluru and Vise-versa, especially during the weekends.
Reply Retweet Like
Mysuru Infrastructure Jul 14
Never gets old. Always Photogenic. Krishnaraja Boulevard.
Reply Retweet Like
Mysuru Infrastructure Jul 14
Thanks to sir, Dr Rajkumar road will be 4 laned soon at a cost of 10 crore. Works to start with the completion of laying of 1.2M dia pipeline.
Reply Retweet Like
Mysuru Infrastructure retweeted
Tanveer Sait INC Jul 14
Replying to @Mysuru_Infra
Have expedited the work would be carried it by PWD, 10.00 cr sanctioned, work tendered Waiting for worker works to complete laying of 1200 mm pipes Work to start shortly
Reply Retweet Like