Daylight Norfolk Co Apr 20
Replying to @WireTestCo
Only MI never anything else.
Reply Retweet Like
Daylight Norfolk Co Apr 18
Cutting bolts out wouldn’t require drilling asbestos sheets. Could also be re-tapped to remove rust. Every roof has an option and risks can be mitigated. Risks on every roof no matter what the material.
Reply Retweet Like
Daylight Norfolk Co Apr 18
Totally different mounting system to tiled roofs and potentially no penetration needed. Sheets held with threaded hook bolts which allows a rail system to be bolted to those. Obviously don’t know what system has been used here but just raising the possibility it’s done right 🤷🏻‍♂️🤷🏻‍♂️
Reply Retweet Like
Daylight Norfolk Co Apr 18
Replying to @bt_uk
Yes but only after several hours fault finding. Terminal labelled 5 is in fact 3 and 3 is 5.
Reply Retweet Like
Daylight Norfolk Co Apr 18
please can you explain why yet again we’ve needed to spend hours working out why secondary telephone points don’t work and find the problem to be an incorrectly labelled 5C master point?
Reply Retweet Like
Daylight Norfolk Co Apr 18
please can you explain why yet again we’ve needed to spend hours working out why secondary telephone points don’t work and find the problem to be an incorrectly labelled 5C master point?
Reply Retweet Like
Daylight Norfolk Co Apr 17
Replying to @cks_electrical
If you can’t have a bit of fun in the day it’s a poor show.
Reply Retweet Like
Daylight Norfolk Co Apr 17
Replying to @cks_electrical
I think the NHS does humour bypass surgery? If they don’t I don’t know where they all go to get one🤷🏻‍♂️
Reply Retweet Like
Daylight Norfolk Co Apr 17
Replying to @Shepiesdad
Perhaps my problem is the use of the word “fault” 🤔
Reply Retweet Like
Daylight Norfolk Co Apr 17
Replying to @Shepiesdad
I don’t understand where you believe other trades doing their own final connections as they requested is our fault! Our EIC clearly states where our responsibilities lie. If they deem themselves confident to carry out such work then they must take full responsibility for it.
Reply Retweet Like
Daylight Norfolk Co Apr 17
Replying to @Shepiesdad
Not our fault by any stretch but our problem. Client knows who’s to blame.
Reply Retweet Like
Daylight Norfolk Co Apr 17
Replying to @PureElectricLtd
That’s exactly how it was left. We’ve now made safe.
Reply Retweet Like
Daylight Norfolk Co Apr 17
When the air source heat pump guys say they will do the final connections! Utter disgrace to even think this is acceptable.
Reply Retweet Like
Daylight Norfolk Co retweeted
Darwin Award 🔞 Apr 16
Guy records the final moments of his life.
Reply Retweet Like
Daylight Norfolk Co Apr 15
After working in churches and needing to have an individual insurance policy to cover the work sometimes to the tune of £50M cover I hate to imagine the cover/claim for Notre-Dame. So very sad to see.
Reply Retweet Like
Daylight Norfolk Co retweeted
Lee Brooks Apr 13
Chilly few days doing external rendering at Gt. Ellingham this week, coming along nicely though.
Reply Retweet Like
Daylight Norfolk Co Apr 12
Please we were also able to hand back the dome ahead of schedule as well. Much improved lighting scheme and uniform light dispersal .
Reply Retweet Like
Daylight Norfolk Co Apr 12
Reply Retweet Like
Daylight Norfolk Co Apr 11
Almost there. Few tidying bits and it’s a wrap.
Reply Retweet Like
Daylight Norfolk Co Apr 10
Going well with their latest LED lighting upgrade and rewire. We put the pressure on their machinery department this week who’s welder hasn’t stopped.
Reply Retweet Like